More work on shedopolis – foundations are completed and base is done

IMG_0082So, here we are with a nice set of brick pillars in place, as well as the ground lowered by 6 inches and the retaining wall on the right built up.

Once everything dried out a bit, the holes were filled in with some of the soil taken out, and the whole lot then covered in a tonne or so of bark. Once the shed’s in, I’ll get Jon to put a paving slab or two in leading up to it.

Below is the finished base, installed on the pillars, insulated before the top goes on. It’s all bracketed and screwed in with 70mm Reiser screws.

Image